Eligible Credits

  • 1 Core LU

    AIBC

  • 1 CPD Point

    BC Housing

  • 1 CPD Point

    BOABC

  • 1 CEC Point

    CACEA

Disclaimers:

  1. Please note that, for the concerned organizations you are responsible for sending your CPD credit request to the concerned organizations; The Township of Langley does not submit CPD credits on your behalf.  (Excluding AIBC LUs)
  2. If you attended this event live at the date above and reported for credits, you cannot claim any additional credits from this on-demand course.
  3. The content of this video is accurate to the date upon which it was presented. As codes, standards, bylaws, and requirements change, certain aspects of this course may no longer be accurate. Please, check with your consultants and municipality if you are unsure of requirements noted in the video.

Course Description

Larry Clay of Clay Construction Inc. presented at this webinar about the difference between conventional design process and IDP, effectively conducting IDP for Step 4/5 buildings with examples, and key stakeholders in the IDP process. 

Nicholas Bell of Foxridge Homes (Qualico Developments) also provided information on how Step Code has changed the building process and how he uses IDP in his projects.

Instructor(s)

Larry Clay

Founder and President of Clay Construction Inc.

2022 Custom Home Builder of the Year
Past National President of CHBA

Nicholas Bell

Project Manager with Foxridge Homes

11 years of experience in Construction, Project Management & Urban Planning
Approximately 1800 Single-Family & Non-Strata Row Homes Built
Since 2019, Approximately 350 Homes Built under the BC Energy Step Code
First CHBA Net Zero Certified in Township

Reviews

5 star rating

excellent

nav mangat

excellent

excellent

Read Less

Survey Responses

“Presenters had a great grasp of the IDP, and examples to back it up. Likewise, the information was concise, with enough details to illustrate the points well”

Anonymous Survey Respondent

“Good speakers speaking from experience on the topic. Showed examples of ways to achieve the step code.”

Anonymous Survey Respondent

“[Most Valuable was] Hearing about common pitfalls builders have experiences and providing solutions to prevent them in the future”

Anonymous Survey Respondent